    What is the standard transformer vacuum oil filling procedure after drying?

    #1695
    Piergiorgio Fabrizi
    Participant

    After drying the insulation, the transformer tank is kept under vacuum while degassed oil is slowly introduced from the bottom. This prevents moisture ingress and air pockets. Fluidex vacuum oil filling systems are designed for this exact task – ensuring dielectric integrity before energization.