The FLD 0.15D system is designed for online drying of transformer insulation (with insulating oil and paper insulation included). The FLD 0.15D online dry-out system is connected to the transformer and remains in operation nearby throughout the drying process. The transformer oil is circulated through three sorbent cartridges in the FLD 0.15D online dry-out system. Due to its high adsorption capacity, the sorbent extracts moisture from the oil, after which the dehydrated oil is returned to the transformer.
Transformer Maintenance
FLD V Transformer Evacuation System
The FLD V transformer evacuation system is engineered to create the required vacuum for evacuating of transformer tanks. This system is essential during the assembly, maintenance, and operation of oil-filled equipment, such as power transformers and high-voltage circuit breakers, with voltages up to 1,150 kV. It’s suitable for both transformer evacuation and dryout processes. The FLD V transformer evacuation system is an ideal solution for companies involved in the installation, repair, and maintenance of transformers, particularly in transformer oil treatment and servicing.
